Architecture

Projects

Design Competitions:

2021 Plac Kossaka, Kraków

2020 Schronisko na Lubaniu

2020 Zespół Szkolno-Przedszkolny przy ulicy Cynamonowej, Wrocław

2020 Tree House Module

Architectural Projects:

2023 Horisont Bygg B & C, Norway - underconstruction

2022 Horisont Bygg A, Norway

2022 Muzeum Apple Polska, Warsaw

2022 Concept design of an new building connected with exisiting hospital (7500 m²) including Emergency department, ICU, sterile department, and operating block – with A.Wąś, T.Zawisza, A.Zaboklicki.

2022 Concept design of a superstructure and refurbishment of an existing hospital (4500 m²) including Emergency department, ICU, sterile department, and operating block – with A.Wąś, T.Zawisza, A.Zaboklicki & D.Zając.

2021 Co-working space in Warsaw (heritage-listed building, 500 m²) – with B.Hodurek Concept design and design development

2021 Concept design of small buildins at Jordana, Kraków (heritage-listed park layout - concept designs) I did a number of concepts to improve the quality of buildings located at the park area (including public toilets, restaurant, trafo station, gardener’s building and local sport facility). We received possitive opinion from the city heritage department. Work for Pracownia Inżynierska. Together with Mirosław Stępień and Bartosz Hodurek

2020 Stara Polana, A hotel in an heritage-listed building

2020 Fontanna na Służewcu, Warsaw (heritage-listed park layout - planning application) Work for Pracownia Inżynierska. Together with Mirosław Stępień and Bartosz Hodurek

60 Curzon Street (£600m High-end residential project - Fit-Out) Revit lead, BIM coordination and drawing packages from design development to construction stage. During my time at Darling Associates

Audley Square House (£2b High-end residential project - Fit-Out and Shell&Core) Revit lead, BIM coordination, drawing packages from design development to tender stage. During my time at Darling Associates

2012 Design support on several private and social housing schemes (Planning application, Tender, Construction stages). During my time at Buttress Architects

Other:

2021 Ikony motoryzacji, an exhibion in Fabryka Norblina

Bang&Olufsen in Norblin Factory, Warsaw (space layout)

Historical Reconstructions & architectural surveys:

2012 Gmach Dyrekcji Kolei, Kraków
2011 Kościół Pijarów, Kraków
2011 Kościół Mariacki, Kraków

Student projects :

2012 Lecture hall, Kanonicza 1, Kraków

Knowledge

WIP