Projects
Design Competitions:
2024 Wydział Informatyki, Kraków
2020 Zespół Szkolno-Przedszkolny przy ulicy Cynamonowej, Wrocław
Architectural Projects:
2023 Horisont Bygg B & C, Norway - underconstruction
2022 Muzeum Apple Polska, Warsaw
2022 Concept design of a new building connected with an existing hospital (7500 m²) including Emergency department, ICU, sterile department, and operating block – with A.Wąś, T.Zawisza, A.Zaboklicki.
2022 Concept design of a superstructure and refurbishment of an existing hospital (4500 m²) including Emergency department, ICU, sterile department, and operating block – with A.Wąś, T.Zawisza, A.Zaboklicki & D.Zając.
2021 Co-working space in Warsaw (heritage-listed building, 500 m²) – with B.Hodurek Concept design and design development
2021 Concept design of small buildings at Jordana, Kraków (heritage-listed park layout - concept designs) I did a number of concepts to improve the quality of buildings located at the park area (including public toilets, restaurant, trafo station, gardener’s building and local sport facility). We received a positive opinion from the city heritage department. Work for Pracownia Inżynierska. Together with Mirosław Stępień and Bartosz Hodurek
2020 Stara Polana, A hotel in a heritage-listed building
2020 Fontanna na Służewcu, Warsaw (heritage-listed park layout - planning application) Work for Pracownia Inżynierska. Together with Mirosław Stępień and Bartosz Hodurek
60 Curzon Street (£600m High-end residential project - Fit-Out)
Revit lead, BIM coordination and drawing packages from design development to construction stage. During my time at Darling Associates
Audley Square House (£2b High-end residential project - Fit-Out and Shell&Core)
Revit lead, BIM coordination, drawing packages from design development to tender stage. During my time at Darling Associates
2017 Electric Motor Factory Somfy–Sopem, Niepołomice
The SOPEM electric motor production facility, part of the French Somfy Group, is located in the Niepołomice Investment Zone and includes offices, production halls, warehouses, and a logistics center. Designed as a combined production, R&D, and logistics hub, the complex features innovative structural solutions and a modern architectural form, with a planned capacity of 2.74 million motors per year. BIM, 36 013 m². During my time at Ingarden&Ewý Architekci
2017 OBIEKT 3M, WROCŁAW
The project involved expanding the existing 3M factory with a new production, warehouse, and office building designed as a compact, two-story volume that integrates seamlessly with the existing facility. BIM, 11 426 m² During my time at Ingarden&Ewý Architekci
2012 Design support on several private and social housing schemes (Planning application, Tender, Construction stages). During my time at Buttress Architects
Other:
2021 Ikony motoryzacji, an exhibition in Fabryka Norblina
Bang&Olufsen in Norblin Factory, Warsaw (space layout)
Historical Reconstructions & architectural surveys:
2012 Gmach Dyrekcji Kolei, Kraków
2011 Kościół Pijarów, Kraków
2011 Kościół Mariacki, Kraków
Student projects :
2012 Lecture hall, Kanonicza 1, Kraków
Knowledge
WIP